{"id":6475,"date":"1995-06-06T18:03:24","date_gmt":"1995-06-06T18:03:24","guid":{"rendered":"http:\/\/thetachapterbtp.org\/content\/?p=6475"},"modified":"2013-03-13T16:24:22","modified_gmt":"2013-03-13T16:24:22","slug":"construction-project-list-for-summer-1995","status":"publish","type":"post","link":"https:\/\/thetachapterbtp.org\/content\/construction-project-list-for-summer-1995\/","title":{"rendered":"Construction Project List For Summer 1995"},"content":{"rendered":"<p><b>INTERIOR RENOVATIONS <\/b><\/p>\n<p><b>THE BASEMENT <\/b><\/p>\n<p><b>\u00a0\u00a0\u00a0 <\/b>Lounge Area<\/p>\n<ul>\n<li>Replace heating vents<\/li>\n<li>Replace floor tiles<\/li>\n<li>New light fixtures<\/li>\n<li>Drywall work and painting<\/li>\n<\/ul>\n<p><b>\u00a0\u00a0\u00a0 \u00a0Scholarship Room<\/b><\/p>\n<ul>\n<li>New light fixtures<\/li>\n<li>\u00a0New w\/w carpet<\/li>\n<li>\u00a0Replace baseboard heating units<\/li>\n<li>\u00a0Replace ceiling tiles and grid<\/li>\n<li>\u00a0Repair and replace counter and study area<\/li>\n<li>\u00a0Purchase two computers \u00a0and laser printer<\/li>\n<li>Purchase appropriate desks<\/li>\n<\/ul>\n<p><b>\u00a0 \u00a0\u00a0\u00a0Chapter Room<\/b><\/p>\n<ul>\n<li>Install perimeter bench seating<\/li>\n<li>Drywall over cement block<\/li>\n<li>Replace ceiling tiles and grid<\/li>\n<li>Install w\/w carpet<\/li>\n<li>Paint room<\/li>\n<li>Replace baseboard heating units<\/li>\n<\/ul>\n<p><b>\u00a0<\/b><\/p>\n<p><b>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0FIRST FLOOR<\/b><\/p>\n<p>Dining Room Area<\/p>\n<ul>\n<li>Patch and paint entire ceiling<\/li>\n<li>Install new light fixtures (softer)<\/li>\n<li>Replace all wood paneling<\/li>\n<li>Paint surface areas<\/li>\n<li>Paint and repair exit doors and vicinity<\/li>\n<\/ul>\n<p><b>Living Room Area<\/b><\/p>\n<ul>\n<li>Replace baseboard heating units<\/li>\n<li>Install mew draperies<\/li>\n<li>Build and install a display case for mosaic<\/li>\n<li><\/li>\n<\/ul>\n<p><b>Kitchen<\/b><\/p>\n<ul>\n<li>New cabinets and countertops<\/li>\n<li>New light fixtures<\/li>\n<li>Replace all windows<\/li>\n<li>Paint room<\/li>\n<li>Install stainless steel wallcovers<\/li>\n<\/ul>\n<p><b>\u00a0\u00a0\u00a0 THE SECOND FLOOR<\/b><\/p>\n<p>Restroom<\/p>\n<ul>\n<li>Remove and replace\u00a0 all walls, tiles, fixtures, piping and valves partitions, shower<\/li>\n<li>basins,etc<\/li>\n<li>Install new lighting fixtures<\/li>\n<li>Install new windows<\/li>\n<li>Paint room<\/li>\n<li>Install new counters and fixtures<\/li>\n<\/ul>\n<p><i>Other<\/i><\/p>\n<ul>\n<li>Remove and replace \u00a0Janitor&#8217;s sink<\/li>\n<li>Paint Janitor&#8217;s area and washer room<\/li>\n<\/ul>\n<p><b>\u00a0 \u00a0\u00a0\u00a0\u00a0The THIRD FLOOR<\/b><\/p>\n<p>Restrooms<\/p>\n<ul>\n<li>Remove and\u00a0 replace all walls, ties, fixtures, piping and valves, partitions, shower basins,\u00a0 etc.<\/li>\n<li>Install new lighting fixtures<\/li>\n<li>Install new windows<\/li>\n<li>\u00a0Paint room<\/li>\n<li>\u00a0Install new counters and fixtures<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><b>\u00a0\u00a0 THE MAIN STAIRWELL<\/b><\/p>\n<ul>\n<li>Remove and replace existing floor tiles<\/li>\n<li>Refurbish ceiling<\/li>\n<li>Apply laminate drywall to cement block<\/li>\n<li>Paint entire stairwelll<\/li>\n<li>Replace lighting fixtures as needed<\/li>\n<\/ul>\n<p><b>\u00a0Total Cost of Interior Work $117,000 <\/b><\/p>\n<p><b>\u00a0 EXTERIOR RENOVATION&#8217;S <\/b><\/p>\n<p>\u2022 Replace deteriorating brick patio wall<\/p>\n<p>\u2022 Repair cement deck as needed<\/p>\n<p>\u2022 Repair fire escape as needed<\/p>\n<p>\u2022 Paint window trim<\/p>\n<p>\u2022 Landscape as needed<\/p>\n<p><b>\u00a0\u00a0\u00a0 Total Cost of Exterior Work $8,000 <\/b><\/p>\n<p><b>\u00a0 Total Cost of Renovations: $125,000<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>INTERIOR RENOVATIONS THE BASEMENT \u00a0\u00a0\u00a0 Lounge Area Replace heating vents Replace floor tiles New light fixtures Drywall work and painting \u00a0\u00a0\u00a0 \u00a0Scholarship Room New light fixtures \u00a0New w\/w carpet \u00a0Replace baseboard heating units \u00a0Replace ceiling tiles and grid \u00a0Repair and replace counter and study area \u00a0Purchase two computers \u00a0and laser printer Purchase appropriate desks \u00a0 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,4],"tags":[39],"class_list":["post-6475","post","type-post","status-publish","format-standard","hentry","category-featured-news","category-theta-data","tag-june-1995-theta-data","entry"],"_links":{"self":[{"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/posts\/6475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/comments?post=6475"}],"version-history":[{"count":6,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/posts\/6475\/revisions"}],"predecessor-version":[{"id":6483,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/posts\/6475\/revisions\/6483"}],"wp:attachment":[{"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/media?parent=6475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/categories?post=6475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thetachapterbtp.org\/content\/wp-json\/wp\/v2\/tags?post=6475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}